Also known as: bp.
BP stands for various terms. Discover the full forms, meanings, and possible interpretations of BP across different fields and industries.
In cementing, the first plug pumped in cementing with the two plug system. It isolates the mud and cement slurry and allows passage of the cement slurry when the plug “bumps” or reaches the float shoe or float collar. It is hollow with a diaphragm that is ruptured by pressure.
BusinessOilTechnologyLast updated: